Trillion Market Capitalization is Not a Dream

Chapter 11: The most important clause 1 has been removed

Hua Renjie pointed to the second article of the "Xishan Provincial Administrative Center Project's Settlement and Review Results Document" compiled by Zhang Yunqing, and said to Zhang Yunqing: "If there are signs of alteration on the visa, you think there are signs of forgery and deduct it. Is it a bit arbitrary for the settlement amount of 800,000 yuan? Find out the visas you think are problematic and let's take a look."

According to Hua Renjie's request, Zhang Yunqing found a visa with a settlement amount of about 300,000 yuan and pointed it to Hua Renjie. The amount of work to be submitted for review is 1,000 cubic meters of roadbed replacement and sand and gravel, 500 meters long and 500 meters wide. The replacement thickness of 2 meters is 1 meter. As a result, the person who reviewed the project department directly changed the result of 1000 cubic meters to 3000 cubic meters on the visa form, and there is no other data of length, width and thickness. Change, you want to call him stupid. He also knows that in the place that has been changed, he needs to sign his name to take effect. The name of the business manager Jia Xuesong is signed there, which is so dazzling. The comprehensive unit price of Xiajia's contract is 100 yuan per cubic meter, so Zhang Yunqing's review result for this visa slip is (-3000+1000) X100=-200,000, minus 200,000.

Hua Renjie didn't give up, and said stubbornly: "Jia Xuesong, the business manager, dares to change this way. There must be a reason. Is there a longer length of the road that has not been counted? Look at the as-built drawings. Look."

Zhang Yunqing pulled out the as-built drawing of the place where the visa was located. The 1,000-meter-long road was only 1,000 meters long on the as-built drawing, and there were no similar roads around.

Hua Renjie said with a bad face: "You can also turn over the other visa forms involved in Article 2 and show me."

Zhang Yunqing patiently checked the visa information, as-built drawing information, contract list, etc. related to the visa form, which had been reduced by 800,000, and checked with Hua Renjie one by one face to face. It took almost an hour. Neither Hua Renjie found a legitimate reason to overturn the conclusion of Zhang Yunqing's review outcome document.

A thin layer of sweat broke out on Hua Renjie's forehead, he wiped it anxiously, and said to Zhang Yunqing, "I'm a little tired, rest for a while, and then you can find out the third and later information by category, and so on. Let's check it step by step." After speaking, Hua Renjie opened the door of the small meeting room No. 3, and after about an hour, Hua Renjie came to the small meeting room No. 3 again, and said to Zhang Yunqing, "Come to us, and then check. Article 3."

Zhang Yunqing knows that the third article is: "3. For the amount of the audit, there are individual cases where the declared amount is less than the settlement audit amount, and the difference is on the order of 100,000 or more.

Existing problems and solutions: This phenomenon does not generally exist in normal settlements. After statistics of this type of problems are found, the audit amount is 1.1 million more than the amount submitted by the next company. Ask the project department to understand the reasons for such problems, and explain the principle that the settlement audit that cannot provide sufficient basis cannot exceed the amount submitted by the next settlement. "

Zhang Yunqing said to Hua Renjie: "Hua worker, this question involves three bills of quantities, and the amount of reduction is 1.1 million. I am also worried that I have made a mistake, so I have calculated the quantities of works involved in these three items on the as-built drawing. , the calculated amount of engineering is the same as the amount declared by the next company, so it proves that our project department is much larger than the amount reviewed by the next company in these three projects. The conclusion is wrong, and I corrected him during the review. Hua Gong, you can see that these are the completed drawings corresponding to the three items, and this is the formula I calculated based on the drawings.”

Hua Renjie carefully looked at the as-built drawings and calculation formulas handed over by Zhang Yunqing, but did not find any obvious mistakes. So he said to Zhang Yunqing: "Okay, that's it for the third item. I'll see if the project department has a more reasonable explanation. Let's look at the fourth item."

Zhang Yunqing looked at Article 4: "4. The amount of steel reinforcement works submitted for review is 650 tons, and the amount reviewed by the project department and the settlement team of the Business Department's Department of Commerce are both 650 tons.

Existing problems and solutions: The total amount of columns, beams, and slab concrete that may be reinforced is 1,000 cubic meters. No obvious engineering quantity errors have been found after a simple concrete quantity review. According to this understanding, the total amount of steel bars should be within 100 tons based on the estimation of the amount of reinforcement in the reinforced concrete structure of the steel bar involved in this project. At the same time, the reinforcement drawing is not seen in the as-built drawing. According to this understanding, the settlement and audit volume of 550 tons of steel bars is increased, and the amount involved is 2.75 million yuan based on the comprehensive unit price of the contract of 5,000 yuan per ton. "

This is the item with the largest reduction in the amount of the single review in this review. Zhang Yunqing said to Hua Renjie: "Hua Gong, this is the drawing of the fourth item. You see, this is actually the walking plank road in this area. Their foundation The total amount of concrete, column concrete, beam concrete, and slab concrete is 1,000 cubic meters. I have repeatedly calculated according to the as-built drawing, which is consistent with the application volume of the next company and the audit volume of our project department. It is equipped with steel bars, but I searched all over the as-built drawings and couldn't find his reinforcement details. So I made an estimate based on the unilateral concrete reinforcement of the beam with the highest quota of 100kg. The maximum amount of reinforcement involved in this project is 100 tons. , there is no huge difference between the unilateral concrete and beam unilateral concrete reinforcement of the foundation and slab. Therefore, this item should be reduced by at least 2.75 million."

Hua Renjie seemed to be a bit snarky and sarcastically said: "Zhang Yunqing, you are amazing, you can review the results without drawings. Jia Xuesong, the business manager of the project department, explained this to me specifically, saying that these reinforced concrete structures are located in the reinforced concrete structure. The parts are quite special, and the owner requires to ensure the quality, and more steel bars must be added.

Zhang Yunqing replied speechlessly: "I just checked according to the contract and combined with the as-built drawings. The owner said to add more steel bars, how many kg of steel bars per cubic meter is appropriate, and the as-built drawings did not explain. Besides, This is a reinforced concrete structure, which involves safety. Everyone in the construction industry knows that if you want to make changes, you must go out of the design institute and produce a design change drawing, have you seen the design change drawing?"

Hua Renjie said, "What is the design change if it is verbally explained."

Zhang Yunqing said: "Even if it is verbally stated, the amount of steel bars reviewed by the project department is 650 tons, and if 1,000 cubic meters of concrete is amortized, the amount of steel bars per cubic meter of concrete is amortized to 650kg per cubic meter of concrete. It is unheard of, not to mention that these are commonly used reinforced concrete structures. No matter how the reinforcement is adjusted, the possibility of exceeding 100kg of reinforcement per cubic meter of concrete is relatively small. In addition, the amount of reinforcement for columns and foundations is not in the beams. On the basis of the amount of steel bars, the amount of steel used to be checked and deducted will leave some room for review.”

Seeing that what the owner said was useless, Hua Renjie couldn't explain it, and said: "Jia Xuesong, the business manager, also said a reason for using so many steel bars, that is, he looked at the amount of invoices provided by the package for him to buy steel bars, and the cumulative amount is 650 tons."

Zhang Yunqing replied coldly: "The amount of rebar can either be recalculated with the correct rebar plan, or reviewed with reference to the current reference rebar consumption. It is impossible to confirm his rebar project quantity with the invoice he bought for rebar. "

Hua Renjie said, "I said you were here to make trouble, but you didn't admit it. The invoices for the purchases have been taken out. Why don't we admit it? Tell me about it."

Zhang Yunqing, "Huagong, there may be thousands or tens of thousands of reasons why the calculation of the amount of steel bars cannot be confirmed by the invoice for buying steel bars. I will list a few at random. Listen:

1. Xiajia actually only bought 100 tons of steel bars, but Xiajia asked the steel bar supplier to issue an invoice for 650 tons. The relevant tax corresponding to the invoice with a difference of 550 tons was borne by Xiajia itself. This money is not Is it a good deal for him to exchange this tax money for our comprehensive price of 5,000 yuan per ton?

2. Xiajia actually bought 650 tons of steel bars, but only less than 100 tons was used for our project, and the other 550 tons were shipped to his own construction site not far from our construction site.

3. Xiajia knew that during the construction period of the project, the price of steel bars fluctuated greatly. When he bought steel bars, the price of steel bars was 4,000 yuan per ton. He expected that it would rise to 5,000 yuan per ton in one month, so he actually bought 650 yuan per ton. tons of steel, and also pulled to our project site for stacking. Then he sold the extra 550 tons of steel within one month, earning 550,000 yuan. At the same time, he took the invoice and asked us to give him the cost of 650 tons of steel. Is he very profitable?

Hua Gong, is it possible for the above three situations that I have assumed to happen? If it happens, can we use the amount of steel invoices purchased by the next family to calculate the amount of work for him? What's more, there is still a problem of the difference between the purchase quantity and the project list quantity? That is to say, the purchase quantity is definitely greater than the quantity of the bill of quantities. The quantity of works corresponding to our comprehensive unit price is the slightly smaller quantity of the bill of quantities, and the purchase quantity cannot be directly used as the quantity of the bill of quantities. "

After hearing this, Hua Renjie said impatiently, "Gong Zhang, you just think too much. I won't talk about this one, the next one."

Zhang Yunqing looked at Article 5: "5. The square is laid with 5cm thick Shandong white hemp granite, and the amount submitted for review is 20,000 square meters, and the amount of project review and the review by the settlement team of the Ministry of Commerce is 19,500 square meters.

Existing problems and solutions: According to the existing as-built drawings, after repeated calculations, the area of ​​the square paved with 5cm thick Shandong white hemp granite is 15,000 square meters, which is 4,500 square meters less than the audited amount. According to the comprehensive unit price of 80 yuan/square meter The unit price of labor services was calculated, and the settlement amount of 340,000 was calculated for the next family. "

So Zhang Yunqing dug out the general plan and the details corresponding to the 5cm-thick Shandong white hemp granite laid in the square, and opened his own calculation formula. Since the places where "5cm thick Shandong white hemp granite" is laid on the entire drawing are commonly used geometric figures, there are squares, rectangles, circles, and ovals, and these geometric figures are also marked on the detailed drawings. The specific key dimensions of the project, the layout position on the general plan is clear, and the data size specification is clear, so the amount of work calculated by Zhang Yunqing was checked one by one according to the as-built drawings, and no wrong calculation formula was found, and no wrong calculation results were found. .

Hua Renjie had no choice but to say, "You're right about the fifth item, let's look at the next item."

Zhang Yunqing looked at Article 6, "6. The project volume of M5 mortar brick flower pond submitted for review is 3,000 cubic meters, and the audit volume of the project department and the settlement audit volume of the business department and the Ministry of Commerce are both 2,980 cubic meters.

Existing problems and solutions: According to the existing as-built drawings, after repeated calculation, the construction volume of M5 mortar brick flower pond is 1,000 cubic meters, which is 1,980 cubic meters less than the audited volume. The comprehensive unit price is calculated according to the comprehensive unit price of 500 yuan/cubic meter. , and calculated the settlement amount of 990,000 more for the next family. "

Zhang Yunqing found the general plan index map and the detailed map of the M5 mortar brick flower pond, and checked it with Hua Renjie one by one according to his own calculation formula, and Hua Renjie did not find any problems.

Hua Renjie reluctantly said to Zhang Yunqing: "Item 6, you are right, let's look at the next item."

Zhang Yunqing looked at it. This is the last one. The seventh one is "7. Brick flower pond 1:2 cement waterproof mortar plastering. The project volume submitted for review is 20,000 square meters, and the project audit volume and the business department's Ministry of Commerce's settlement audit volume are both 19,800 square meters.

Existing problems and solutions: According to the existing as-built drawings, after repeated calculations, the 1:2 cement waterproof mortar plastering project for the brick flower pond is 5,000 square meters, which is 14,800 square meters less than the audited amount, and the comprehensive unit price is 25 yuan/square meter. The comprehensive unit price of rice was calculated, and the settlement amount of 370,000 was calculated for the next family. "

Zhang Yunqing found out the general plan index diagram and the detailed diagram of the 1:2 cement waterproof mortar plastering of the brick flower pond. Since this article is basically related to the sixth article, Zhang Yunqing checked with Hua Renjie one by one according to his calculation formula, and the checking was completed soon. Likewise, Hua Renjie did not find the problem of calculation errors.

Hua Renjie said, "You've got the seventh item right, so that's it. We've worked hard all day, and we'll get off work soon. Let's go, let's report to President Hua about the check."

Hua Renjie swayed ahead, Zhang Yunqing followed carefully, holding the 60cm thick documents for review.

When the two arrived at the door of Huabai's office, the door was closed. It seemed that the leader was still talking, so the two had to wait at the door of the office.

About half an hour later, the office door of the century-old office opened.

Hua Baibai waved to the two of them and said, "You two~www.novelmt.com~ Come in, it's half an hour after get off work. Hua Renjie, you simply report the results of the check with Zhang Yun."

Hua Renjie sat down and said, "Mr. Hua, after a day of careful checking with Zhang Yunqing, we have deleted the most important first item, among which items 2, 3, and 4 are in dispute and need to be further verified by the project. 5, 6, and 7 Zhang Yunqing is right and should be reduced."

Hua Baibai asked happily: "How much is the disputed amount? How much should it be confirmed to be reduced?"

Hua Renjie answered immediately, "Mr. Hua, the disputed amount is 4.65 million, and it is confirmed that the amount that should be reduced is 1.7 million."

Hua Baibai looked at Zhang Yunqing and asked, "Yunqing, this is the result of your verification today, right?"

Zhang Yunqing answered honestly: "Mr. Hua, there is no problem in confirming that the amount that should be reduced is 1.7 million. I don't agree with the amount in dispute. It is 4.65 million. Because the current amount of steel bars is 1,000 cubic meters of concrete, it is used. 650 tons of steel bars, which is seriously incompatible with the sand consumption table of reinforced concrete components in the construction industry. Therefore, if the correct as-built drawings of steel bars are used to calculate, the amount of steel bar construction will be reduced. This so-called disputed amount 4.65 million, which will become a larger reduction amount."

Hua Baibai looked at the two of them, looked at the watch on his left hand, and said anxiously: "Yunqing, Renjie, I have an appointment with someone, but it's too late. This is the way to go, let me have all the information. Here, I'll study it later. Go ahead and do your work. I'm leaving."

Zhang Yunqing and Hua Renjie heard Hua Baibai's arrangement, so they left Hua Baibai's office.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like