Zhou Wencheng continued to ask: "In addition to the quality of earthwork, are there any problems?"

Greening engineer Cui Yong replied: "There are still problems. During the planting process, the planting workers did not master the technology in place. First, the integrity of the soil ball was destroyed. Second, the backfilling of the planting soil under the soil ball was not in place, and some formed If the pores are removed, it directly causes the plants to be unable to absorb maintenance in the void, and accelerates the death process of the seedlings.

In the process of supporting the plant after planting, the method is wrong. Many workers directly use nails to nail the support rod and the main rod of the plant to fix it. Although the main rod of the plant is fixed, the plant is alive. , need to be carefully cared for, just like nailing something on the human body, it will cause physical discomfort to the plant, and then cause disease. lead to increased plant mortality.

And every plant needs to be watered with fixed root water after planting. One is to water it in time, and the other is to water the temperature not too high. Some workers do not water the root water for a few days after the seedlings are planted, and some do it when the sun is shining. The water is hot to the touch when touched by hand. Just like drinking boiled water, it is easy to burn plants directly.

There is also the problem of watering. The plants must be maintained and watered in a timely and stable manner within one month after they are planted. The plants died of thirst a lot. "

Zhou Wencheng asked: "You have a lot of problems related to the mortality rate of greening. Is there a solution?"

The greening engineer replied: "There is a solution, which requires Mr. Zhang to start with the cost. Whoever is responsible will suffer economic losses. After such a strict implementation for a period of time, everyone gradually got used to it and improved the level of confidence. Providing quality awareness of products can be solved fundamentally. Otherwise, they are maximizing their own interests by doing this, but seriously damaging the interests of the company. If they do not control it, it is no exaggeration to say that , it is entirely possible to cause the entire project to lose money.”

Zhou Wencheng asked Zhang Yunqing, "Mr. Zhang, let's see how to solve this problem."

Zhang Yunqing replied: "This issue is relatively complicated. After the meeting, I asked Cui Gong to discuss it carefully, to find out the crux of these problems, to study the contractual agreements of their relevant units or individuals, and to provide a feasible and down-to-earth solution. "

Zhou Wencheng nodded and replied: "Okay. I also hope to solve the problem as soon as possible. There are many and urgent matters. Everyone should work overtime. We must solve major problems in advance, otherwise the consequences of production will be unacceptable to the project department and the company. of.

Are there other problems with greening? "

Greening engineer Cui Yong replied, "No more."

Zhou Wencheng arranged: "Then, the next engineer of the park, Wan Cong, tell me."

Wan Cong was about to fall asleep. After hearing Zhou Wencheng calling him, he replied embarrassedly, "I'm sorry, Mr. Zhou has been working overtime for too long this time, and his mental state is not very good. I just lost my mind."

Zhou Wencheng seemed to be more distressed and said: "Wan Cong, this period of time is busy and busy. I often see you working overtime until late at night, and you have to get up early in the morning to go to the construction site to arrange work. Long hours of overtime will delay If our bodies are broken, we should try our best to find a spare time for work in the future to take a good rest and restore our energy. I was distracted just now, so I will tell you again. It is time for you to talk about the work of the garden construction, the key is to talk about The work content related to the business person in charge of the project department is convenient for Mr. Zhang to quickly understand the work related to the garden construction on the project."

Wan Cong twisted his neck, rubbed his temples and replied, "Okay, thank you President Zhou for your understanding and concern.

I would like to talk about the work on garden construction. Now our project has two main garden construction teams, and their number of workers has been fixed at more than 40 to 50 for a long time. If this number of workers is calculated, it cannot meet the current construction schedule requirements of the construction party.

After many times of communication and coordination, there was no clear reply.

Instead, I heard it, because we arranged for a job rush, and they asked for information about the price increase in the contract unit price.

If it is really necessary to rush to work according to the requirements of the construction party, it is suggested that the company should prepare to introduce a new garden construction team and allocate the construction areas that the existing team cannot take into account to the new team for implementation. "

Zhou Wencheng arranged: "This suggestion is okay, I agree. It depends on whether the leader of the area, Mr. Zhao, agrees."

Zhao Manfu replied: "I also think Wan Cong's opinion is good. It's enough to implement the coordination and arrangement of the project manager, General Manager Zhou. If the area needs support, just talk about it directly."

Zhou Wencheng replied, "Okay. Thank you Mr. Zhao for his support of the project department.

Wan Cong, you put forward this opinion. Do you have any more detailed opinions and solutions? "

Wan Cong asked, "Mr. Zhou, what do you mean by more detailed opinions?"

Zhou Wencheng said: "For example, a new team needs to be introduced, which areas can the new team do, what is the approximate amount of work, and how long it will take to complete the project."

Wan Cong replied: "I can understand this way~www.novelmt.com~ The area that the current construction team cannot take into account is roughly more than 20,000 square meters. It needs to be completed within two months. It takes more than 1,000 working days for each major worker to complete 20 square meters per day. Divided by 60 days, it takes 16.7 workers per day to complete the job. However, there may be wind and rain in the middle. Team entry requires preparation time to actually implement, as well as some other unforeseen factors.

Therefore, it is recommended to introduce a new team with more than 25 major workers, and the number of small workers to cooperate with is determined by the boss of the new team according to the actual situation. "

Zhou Wencheng said: "Your analysis is relatively clear, so just follow this opinion. Do you have the resources for the new team now?"

Wan Cong replied, "Mr. Zhou, I currently don't have such new team resources."

Zhou Wencheng said: "I have information on a few paving teams here. After the meeting, you can ask me to get the contact information, and ask them to come to the project department to check the situation and discuss it. If you are really interested and have the strength to complete the job rush task If yes, I will introduce him to President Zhang for price negotiation."

Wan Cong replied, "Okay. In addition to the need to introduce new teams, there are still some small problems."

Zhou Wencheng asked: "What is the small problem, you can directly talk about it."

Wan Cong replied: "The on-site garden construction team of the project department also had some on-site visas. In the past, they had been delayed without going through the written confirmation procedures for them. Now it has a little impact on their enthusiasm for work."