Yu Danzhen replied with a calm expression: "Mr. Zhang, Boss Bian's sand and gravel cushion, the drawing requires a 300-thick sand and gravel cushion, but in fact, use a tape measure to measure the thickness of the edge at the site. 200 thick, the thin part is 100 thick, and even a few centimeters thick. If it is calculated according to the average thickness of the random inspection, it will definitely be less than 150 thick. I now calculate it as 150 thick, and I have to It can be considered that he has released water for his project, but you can see that Boss Bian is not satisfied now and wants more."

Zhang Yunqing asked Bian Zhenjia, the owner of the garden construction team, after Yu Danzhen's statement, "Boss Bian, does what Yu Danzhen said make sense?"

Bian Zhenjia, the owner of the garden construction team, replied: "It sounds reasonable, but in fact it doesn't make sense. Of course, this reason cannot be blamed on the general manager. His essential reason lies in the confirmation of the contract unit price."

Zhang Yunqing motioned to Bian Zhenjia, the owner of the garden construction team, to continue explaining.

Bian Zhenjia continued to explain: "When your company compiled the price list for the comprehensive unit price of the continuous sand and gravel, the content of the continuous sand and gravel on one side was only given to the other party. The purchase unit price is the actual purchase price given to the market, which is a few percentage points lower than the information price. A slight fluctuation in the purchase unit price of even sand and gravel is a loss relative to the information price.

Mr. Zhang, you said, in this case, can the side with the sand and gravel that I purchased on site be able to backfill the side that requires the compaction density on the drawing? "

Zhang Yunqing replied: "That must be the relationship between the loose square and the solid square. The quota is 1.25 loose squares can be compacted to a solid square. Did you calculate the compaction relationship during the actual construction?"

Bian Zhenjia, the owner of the garden construction team, said: "I have arranged and done statistics on the site. The actual relationship between the loose square and the compacted square is that 1.3 loose squares can be compacted to get 1 compacted square. From this perspective, you The contract unit price given to me is not enough, at least 30% less.

If you have to say that I am cutting corners, it is also the principle of your company's contract unit price setting. You have to force me to cut corners on the spot, otherwise I will suffer serious losses. "

Zhang Yunqing asked again: "Even if what you said makes sense, then according to what Yu Danzhen said, you did not steal 30% of the project, but more than 50%. Are there other reasons for this?"

Bian Zhenjia, the owner of the garden construction team, replied: "There are other reasons. The backfill with sand and gravel at the base is earthwork. As long as it rains, the earthwork is like mud, very soft. If the weather is good and the sun is shining, If the soil is relatively dry, it is very hard, like a slate, and a small excavator cannot dig it.

And a lot of the continuous sand and gravel on my site this month are when the soil is relatively soft, and the 300-thick continuous sand and gravel are laid on it. There is not even sand and gravel, only mud can be seen.

This situation, the site manager Wan Cong is very clear, the project manager Zhou Wencheng Zhou is also very clear.

Even the gravel that I can clearly see on my face now is actually re-paved at the back.

On the issue of backfilling with sand and gravel, not only is I not asking for more money, but I am getting in thanks to the money.

Therefore, please give more support to Mr. Zhang on this issue. "

Zhang Yunqing asked: "According to what you said, there is indeed a certain truth. But have you told Yu Gong about these issues before?"

Yu Danzhen replied: "When I was receiving the party at the scene before, their production staff and budget staff mentioned this matter. We and they wanted photos, but they couldn't provide them, so I gave him to deal with it according to my understanding. The measurement issue."

Bian Zhenjia, the owner of the garden construction team, answered the call in a timely manner: "Mr. Yu, Mr. Zhang, the question of this photo is indeed better. At that time, I was fortunate to arrange for someone to take a picture with a camera at the scene. Today I took the camera. I also brought it here. You see, there is only this photo. This photo can clearly see that the place where the car with the sand and gravel is pressed is obviously about 20 cm lower than the place where it is not pressed. These vehicles and other transporters of soil, stone, seedlings, etc., after repeated rolling by various vehicles, it is difficult to see even sand and gravel in places where there are enough 300-thick continuous stones.

Now, the thickness of the continuous sand and gravel that can be measured by Mr. Yu at the site are all the continuous sand and gravel that I added later.

Therefore, on the issue of the thickness of even sand and gravel, my idea is that there is not much thicker than 300, and a lot of forest is thinner than 300. Just keep the contract and measure the 300 thick. . "

Yu Danzhen said: "Boss Bian, as you said is true, then the extreme situation you described may occur only when the subgrade is all soft soil. I will take care of your matter~www.novelmt. com~ I also asked Wan Cong, a garden engineer, to find out about the situation. The particularly difficult situation you mentioned has occurred before. The overall paving area with sand and gravel accounts for about 20% of the area, that is, about 80%. You obviously cut corners. I don't think it's correct that you measure all the sand and gravel for you at 300 thickness."

Bian Zhenjia, the owner of the garden construction team, had a black line on his face and could not refute. He just sat there silently, obviously a little impatient.

Zhang Yunqing expressed comfort: "Boss Bian, don't worry about getting angry, we will learn more about your actual situation, and then report to the leaders for advice.

You have to trust me, I will give you a satisfactory result with a realistic attitude.

Do you have any other problems with the confirmation of your output value this month? If there are any, please share them together, so that I can report clearly to the leaders and seek a reasonable solution. "

Bian Zhenjia, the owner of the garden construction team, listened to Zhang Yunqing expressing his willingness to give him advice on solutions, and continued to speak: "When Yu Gong was reviewing the concrete cushion, the drawing was 200 thick, and she gave 100 thick. This 100 Thick, I know at the scene that this is because the elevation of the grassroots has already reached that place, not to actively cut corners, it does exist, but such places are relatively few, and there are more places that meet the thickness of 200. Even It is more than 200 thick places."

Yu Danzhen replied: "Mr. Zhang, his 100-thick concrete cushion is not as small as Boss Bian said. It can be said that 60 to 70% of the places are the edge thickness of concrete, It is really rare to have a thickness of 200 on the edge of the concrete. I set the thickness of 100 for him after repeated weighing.

Mr. Zhang, under your judgment, what thickness should I calculate for him? "