Zhang Yunqing took the engineering quantity calculation document handed over by Li Xixuan and read it.

Li Xixuan sat uneasily across from Zhang Yunqing's desk and picked her fingernails to ease her nervousness.

Zhang Yunqing spent more than ten minutes reading the project calculation document calculated by Li Xixuan.

The calculation of the electronic version transferred on the computer has been transferred.

After Zhang Yunqing decompressed it, he briefly browsed the electronic version file of the calculation.

Zhang Yunqing arranged for Li Xixuan: "Tell me about your order, precautions, basic ideas, etc. for this calculation. Let me fully understand the calculation ideas, methods, and methods."

Li Xixuan replied, "Mr. Zhang, I haven't communicated like this before. I'm afraid I'm not good at speaking."

"It doesn't matter, just talk more. I have never asked anyone like this before. We always face new problems in our work. As long as we calm down and think carefully, we will always find solutions. ."

"Okay, then I'll try it."

"let's start."

"It's like this, after I got the bidding list for this project, I imported its list into an Excel-type table file in the pricing software. It took almost two hours to get familiar with all the list names of the bidding list. , project characteristics, units of measure, and list quantities.

Then, I first read the paper version of the bidding construction drawings.

After reading the quality documents of the bidding construction drawings, it took almost half a day to be basically familiar with this set of bidding construction drawings.

Well, at the back, we can see the electronic version of the bidding construction drawing.

On the CAD drawing, the priority is to look at the general plan pavement. On this drawing, find out the horizontal and vertical dimensions respectively, and use the software's measurement tool function to check whether the plane dimensions and the marked data are consistent.

So the scale of the drawing is correct.

Well, then, the preliminary calculation work begins.

The order of quantity calculation is to find the bill of quantities item at the location of Area A in the list of tenders.

According to the bill of quantities items in the bidding, and then combined with the bidding construction drawings, the calculation formulas are listed item by item, and the corresponding workload is calculated.

After the calculation, go back to the position of the plane index map in area A, and carefully check the index content drawings one by one with the bill of quantities items in the bidding list in a clockwise direction, whether it is a garden construction professional, a hydropower professional, or For the greening profession, the bill of quantities items are not omitted.

A bit of a problem is that there are discrepancies in the bidding list for the number of individual trees based on the number counted in the drawings. There are more and less. The number of lamps and lanterns is exactly the same as that in the tender list. "

After listening to Zhang Yunqing, he nodded slightly and said: "Well, it's more clear. Have you checked the amount of earthwork?"

Li Xixuan said: "The amount of the planting soil is calculated by multiplying the planting area by the average planting soil thickness. This is basically the same as the list of the tendered works. The excavation and filling of large earthwork needs to be done according to the square grid. For the calculation and verification part, because professional software is required, I will not know this for the time being, so there is no core.”

Zhang Yunqing said: "When you are free, find the surveying engineer Lin Jun. If you are in a hurry, just ask him for a result. However, you will find him in the future and find out what software calculation is used. You can install this software on your computer, and you can calculate the amount of earthwork by yourself at any time in the future.”

Li Xixuan asked, "Will he teach me? I'm not familiar with him at all."

"Everyone is not familiar with it. Since we have come to the same project, we naturally want everyone to help each other. You can find it by yourself. If you can teach you the best, then come back and tell me if you can find it. A practical solution."

"Okay, I'll try Lin Jun, a surveying engineer, later."

"How do you calculate the earthwork for your water and electricity trenches?"

"It doesn't count for him. It's not a big deal, so it's just the amount of the bidding project."

"He uses the square quantity as the unit, not the meter, or a simple calculation. After you calculate the length of the pipe trench, you can simply multiply it by a coefficient of 0.45, which is basically the pipe trench excavation and filling. party's bill of quantities."

"How did this coefficient come from? I haven't seen it on the quota on the South China Sea side."

"This is a stipulation coefficient for other provinces. It has a certain theoretical basis, which reduces the difficulty of our work when calculating the amount of work."

"Okay. Mr. Zhang, do you need to pay attention to the amount of engineering I calculated?"

"The time left for us to complete the bid clearance is getting closer and closer. You should intensify your bid clearance work during this time, and prepare to work overtime at night and on weekends. Before completing the bid clearance work, you cannot relax at all. Can you understand?"

"I can understand."

"Can it be done?"

"Don't worry, Mr. Zhang, although my current technical level is not very good, I have always had the spirit of hard work and perseverance, and I will complete this challenging task of clearing the standard on time."

"Okay, that's hard work for you. Go get busy."

"it is good."

After Li Xixuan left Zhang Yunqing's desk, UU reading www.uukanshu.com returned to her work station and wanted to continue the calculation of the engineering quantity of the bidding construction drawings.

The surveying engineer Lin Jun came to the office of the Ministry of Commerce. Li Xixuan hurriedly said to Lin Jun, "Hello, Lin Gong, I was going to ask you for help with something, so you came. It really means that Cao Cao and Cao Cao are here."

Surveying engineer Lin Jun asked in a veiled state, "Oh, beauty Xiaoli, what are you looking for from me?"

Li Xixuan said, "I'm currently calculating the amount of work to clear the bid. There is one job that I can't do. I want to ask you for help."

Surveying engineer Lin Jun said with a smile, "Do you know how to calculate a large amount of excavation and filling?"

Li Xixuan replied, "Lin Gong is smart. You can tell by just mentioning it. How about it? Please arrange time to help me do the calculations."

Surveying engineer Lin Jun replied: "I'm afraid I'm too busy to win these two days. There is a job rush at the scene. You know, there are many things that need to be dealt with overtime, and I'm exhausted every day."

Li Xixuan thought for a while and said, "Don't panic, within these two days, let's do it, I will send the relevant electronic version of the drawings to your QQ mailbox. After you calculate it within ten days, tell me the result. data, okay?"

The surveying engineer Lin Jun replied: "I have no problem with it for such a long time. You can send me the documents first. I will try my best to take the time as soon as possible and send the result documents to you after the calculation is completed.

That's it, I still need to find your manager Zhang, it's a little urgent. "