My Bank Is Connected to Another World

Chapter 206: Last transaction

   until noon.

  The meeting is over. The main task behind is the assignment of engineering tasks. One party is responsible for one, and the construction period is set. They know that they will be busy next.

   The schedule is tight.

Heavy task.

High standard.

   At least two shifts are needed, but fortunately, there is a shortage of everything else, but there is no shortage of manpower.

   This season.

   is already in autumn.

  The farmer is busy near the end, and the labor force should not be too easy to find.

   After a lunch, they left and started to prepare.

   Craftsman.

   material.

   tools.

   hasn't been there yet, but someone is already busy with this, and they can be arranged one after another in the afternoon. Of course, the first job is not to start building the factory right away.

   is to build temporary living facilities.

   A rough calculation.

   More than 20,000 manpower will be invested this time, half of which are transporting construction materials. While feeling the pressure, they are also a little bit excited.

   Because this is the first time they have participated in such a large project.

  In the past, how big was the land for building a house or workshop?

This.

   is a huge industrial area with almost no edge.

  . . .

   Afternoon, assembly, after assigning tasks.

   The construction of the aboriginal residents started, because they were allocated nearby, and they were very close to each house. There was no need to live in temporary housing. Many of them were only a ten-minute walk away.

   A fenced area.

   "The task this afternoon is to level the place, level the protruding areas, fill in the recessed ground, and finish the work early so that you can go home early."

   The 60-year-old supervisor said loudly.

   listen.

   Dozens of people are immediately energetic.

   Look around.

   There are not many ups and downs here, there is no small mountain bag for them to dig, only two wells need to be filled, which is not a big project.

   then.

   They shoveled the earth in full swing.

of course.

   After the work is not finished, the supervisor said it doesn’t count, and the person in the company will judge it. If the quality is not up to the standard, it must work overtime.

   more than three hours later.

   The inspection technician from the firm came over to take a look and nodded.

"Ok."

   "Yes."

   wrote it down in the notebook, and it was considered that their work was completed.

   After the inspection technicians leave, it means that they can go home and rest.

   "Don't be too happy, today is the first day, so the task is not heavy, and the progress of the entire industrial zone is very tightly controlled, so please be prepared hard."

   The supervisor did not forget to remind.

   Everyone didn't care too much.

   Hard work?

   Why don't you work hard?

   It’s not easy to live.

   It’s a good job to have a job like this. They never think that the ‘host’ is a kind-hearted existence, so it is possible that they can only do light work.

   and.

   The owner has taken care of it very much.

   Just like the wives of each family, they are often incorporated into the logistics. The only job they have to do is to cook for them, not a big pot of rice, but to do them individually.

   is equivalent to doing what you usually do, and you still have monthly money to get.

  Absolute conscientious owner!

  . . .

   Three days later.

   Command.

   "As of 6 o'clock this afternoon, all the leveling and consolidation of the main roads have been completed, and the road edge protection work will begin tonight."

   "Early tomorrow morning, the first batch of roads can be poured."

  "..."

   "Tomorrow afternoon, the main column of the warehouse of the first phase of the project will start to support molds. Due to the lack of pouring materials, the pouring work will not be possible until at least five days."

  "..."

   "The core production building foundation pit is being excavated, and it can be completed tomorrow, and then deep foundation excavation will be carried out."

  "..."

   Listening to the progress, Shu Fu was quite satisfied.

   However, although it is fast, it takes some time before it can be put into use. There is no other way. The amount of work is too much!

   Earthwork.

   Foundation.

   subject.

   Package.

   At least one and a half months.

   Someone said: It’s impossible. Even if it is a modern factory, it will take a few months to talk, but it will take a year or two. What's more, it’s impossible for an industrial zone.

   However.

   Shu Fu wants to say: The progress is so fast.

   This is not about building a high-rise residential building. The foundation is strenuously laid. It takes a month to maintain it. What he wants to build is a factory building and a warehouse, which will only support three floors.

   The main buildings are mostly single-story.

   is like a warehouse.

   is not completely closed.

   For some storage warehouses for raw materials, only the pillars need to be erected, and a shed is just fine, and some wooden boards are covered on it, because it must be demolished.

   In the future, the flammable wooden roof will be eliminated in the production of steel plates.

   Therefore, how simple it is now.

  The land is leveled.

  Upright column.

   pour the ground.

   take the beam.

   Cover the top.

   It's like building a warehouse in Qiheng Mountain. If the materials are sufficient, it can be completed in a day. Of course it can't be compared here, but ten times the construction period is always enough?

   There is only one largest project.

  ---Core plant.

  Due to the need to carry large-scale equipment, the foundation is a little deeper, the main body is made of high-strength gel material, and the plan is not one layer, but three layers.

   But only one floor was built in the early stage, so I will put it into use first.

   After binding the remaining two floors, Shu Fu prepared the steel structure.

   The planned one master and two backups are not all built together, but one is built first.

   Therefore.

  The entire construction period of the first phase of the project can be completed within one and a half months, and the second phase of the project will begin construction of the spare warehouse and other supporting facilities.

   The entire industrial zone is completely completed, at least next year.

   But it only takes one and a half months to reach the initial use requirements.

   If the materials are not enough, the first phase of the project can be completed in one month.

  . . .

   In the second phase of the project, there will be thermal power plants and metallurgical plants. As for the commissioning of the first phase, the electricity is mainly provided by diesel generators. Do you feel that the power is not enough?

Ha ha!

  Look at the super high-power diesel generator set.

   is not comparable to thermal power plants, but driving a factory is not a problem at all.

   Where does the oil come from?

   Earth Lane.

   Earlier, Shu Fu ordered his subordinates to store oil secretly and legally. After so long, there are a lot of reserves. It only takes two months to wait for the support of the thermal power plant.

  Everything has a plan~www.novelmt.com~Three more days have passed.

  Lo City.

  Fengfu.

   After receiving news from afar, Feng Changshang grows a long sigh. Unexpectedly, the watch maker built a factory in Yuancheng and united so many forces.

   directly kick the agent out of the game.

   This sigh.

   is the situation.

   is also Shu Fu. In his opinion, Shu Fu is the one who is about to be kicked out. With an industrial zone, an intermediary like Shu Fu will definitely have no way out.

of course.

   Shu Fu can't be poor if he is poor. He earned so much before and can spend dozens of his life saving a little bit.

   "Master."

   The butler hurried in.

   "What's the matter?"

   "Young Master Shu's retainers are here."

   "Please come."

   Feng Changsheng hurriedly said, sent someone to contact this morning, and wanted to ask about another batch of paper. After several cooperations, it changed from Shufu delivery to home delivery.

   "Feng Patriarch, these were brought by the young master's family, totaling 300 copies."

   invited to enter the hall, and the other hand handed him a small wooden box.

   "Feng Pai, this should be the last transaction of this kind of paper." The other party said again.

   listen to this.

   Feng Changsheng sighed again. Sure enough, Shu Fu's acting status was about to end. He didn't ask about the specific situation. Anyway, it should not be too different from what he thought.

  . . .

   Regarding the sale of money from the bank, Shu Fu decided to come to an end. At that time, he really had nothing to sell, so he could only bring one set of clothes a day, and he made too little money.

   This is the only way to sell money from the bank.

   can be now.

  Business is gradually getting on the right track.

  The profit from selling money from the bank has been far behind other commodities, so it simply stopped.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like